OpsForces helicopter ceiling fan ● TARGET ACQUIRED LAT 27.29 · LON 80.35
// UNIT ACQUISITION

ACQUIRE YOUR AIRFRAME

Your ceiling fan is the mount. OpsForces is the payload — a fully detailed military helicopter that turns your blades into a live rotor the moment the fan spins.

  • FITMENTALL STANDARD FANS
  • INSTALL~10 MINUTES
  • ROTORLIVE ON ALL SPEEDS
  • AIRFRAMES5 VARIANTS
// LIVE FEED

FIELD FOOTAGE

Three confirmed feeds. Switch the channel.

REC CAM 01
// COMPARATIVE ANALYSIS

THREAT ASSESSMENT

OpsForces against every alternative. Select a target to interrogate the data.

ROOM PRESENCE0
USES A FAN YOU OWN0
LIVE MOVING ROTOR0
COMBAT DETAIL0
ZERO ASSEMBLY0
0 COMBAT RATING SUPERIOR
★★★★★ RATED 4.8 / 2,000+ FIELD RATINGS
// VERIFIED FIELD REPORTS

RECON LOG

LOG // UNIT SNAKEBITE

Mounted over the den in ten minutes flat. Whole room reads different now. Fan runs identical — no wobble.

★★★★★ · R. MALLORY
LOG // UNIT GUNFIGHTER

No clearance issues, no added noise. Runs exactly like it did before I mounted it.

★★★★★ · D. KOVAC
LOG // UNIT GREY GHOST

Panel detail is sharper in person than the listing shows. Feels solid, not toy-grade.

★★★★★ · M. TRAN
LOG // UNIT FAST ROPE

Put it in my son's room. He shows it to every single person who walks in the door.

★★★★★ · J. REYES
LOG // UNIT SNAKEBITE

The shark mouth is the whole thing. Photos undersell it — it looks mean up there.

★★★★★ · T. BELL
LOG // UNIT NIGHT STALKER

Grenade pull chain is a ridiculous detail and I love it. Makes the whole piece.

★★★★★ · C. DAO
LOG // UNIT GREY GHOST

Bracket lined up first try. Instructions were clear enough I never looked anything up.

★★★★★ · W. HOLT
LOG // UNIT GUNFIGHTER

Ordered a second before the first was even mounted. Different airframe this time.

★★★★★ · L. ORTEGA
// INTELLIGENCE BRIEF

INTEL

opsforces@ops — briefing.sh

Affirmative. OpsForces is built for standard ceiling fans. It mounts to the underside of the housing and never touches the blades or motor.

Exactly as before, on every speed setting. Your blades become the rotor — that is the entire point.

Three steps, roughly ten minutes, basic household tools. Full instructions ship in every crate.

Metal and reinforced composite, finished with combat paintwork and markings on every airframe.

Delivery runs 5–12 days. If your unit arrives damaged, send a photo and we deploy a replacement.

// FIELD MANUAL

DEPLOYMENT SEQUENCE

01MOUNTFix the bracket to the fan housing with the included hardware.
02SEATLower the airframe until it locks. Nose forward, tail clear.
03FLYAttach the pull chain, run the fan, rotor goes live.